Construction Linked Plan
Victory Tower (Tower A):
- Rs. 9450 psf (increases @ Rs. 50 per sq ft per floor
- till 39th floor and @ Rs.100 per sq ft per floor
thereafter)
Tower B:
- Rs. 7950 psf (increases @ Rs. 50 per sq ft per floor
- till 39th floor and @ Rs.100 per sq ft per floor
thereafter)
Tower C (3 BHK):
Midrise (3 and 4 BHK):
Midrise (Duplex Penthouse):
EDC, IDC, RFMS, Car Parking, etc charges on as
applicable basis.
|
Subvention Scheme (30 months)
Victory Tower (Tower A):
-
Rs. 10600 psf (increases @ Rs. 50 per sq ft per
- floor till 39th floor and @ Rs.100 per sq ft per
floor thereafter)
Tower B:
- Rs. 8925 psf (increases @ Rs. 50 per sq ft per floor
- till 39th floor and @ Rs.100 per sq ft per floor
thereafter)
Tower C (3 BHK):
Midrise (3 and 4 BHK):
Midrise (Duplex Penthouse):
EDC, IDC, RFMS, Car Parking, etc charges on as
applicable basis. |